Blank
  After
       click on images for larger view
       Before
               click on image for larger view
Video
This was a second floor addition that we were hired to finish.  We restructured and leveled the floor joists, installed new DWV and supply lines (plumbing), sheathed and tiled the floors, installed shower stall and jacuzzi, sinks and water closets, tiled walls. built 3 bedroom closets, hung doors and installed casings and moldings.
This is a video of the almost finished project. Still needed to be cleaned and Electric outlet face plates needed to be added. 
              Double click video to enlarge.